Tianjin Green State Energy Equipment Co., Ltd. primarily specializes in the research, development, manufacturing, sales, and operational services of modular and integrated equipment sets for the recovery of oilfield gas, coalbed methane, biogas, and vented gases. The company has established standardized complete equipment products with MRC refrigeration technology as the core.
With its professional integrated service capabilities, the company consistently provides efficient and intelligent comprehensive solutions to its customers. It is committed to the research and promotion of LNG (liquefied natural gas) equipment assembly in workshops, aiming to create truly mobile integrated equipment.
The solutions provided by the company are mature and reliable, and the supporting equipment can be customized according to the specific needs of customers. The capacity of the equipment assembly can be flexibly adjusted to meet processing requirements ranging from 10,000 to 2,000,000 cubic meters per day.
Our company has two equipment manufacturing bases dedicated to the production of workshop-integrated LNG equipment, respectively located in Shenyang and Baodi, Tianjin. These manufacturing bases hold certifications such as A1 and A2 pressure vessel manufacturing and design permits, ASME pressure vessel manufacturing qualifications, qualifications for anti-corrosion insulation and pipeline cleaning, and permits for pressure pipeline component manufacturing. The company possesses the capability to research, design, manufacture, and process various specialized equipment required for the petroleum, petrochemical, natural gas, equipment manufacturing, and ship platform industries, fully meeting the requirements for the production of specialized integrated equipment.
Main Business: Our company independently develops workshop-integrated LNG (liquefied natural gas) equipment for comprehensive system integration. The manufacturing, assembly, interconnecting pipelines, prefabrication of steel structures, and end-to-end testing of all integrated equipment are completed in the workshop.
Workshop-integrated LNG equipment consists of four major integrated equipment components: pre-treatment and purification integrated equipment, liquefaction integrated equipment, public works integrated equipment, and supporting facility integrated equipment. It features flexibility in assembly and disassembly, immediate readiness for use, and minimal construction requirements.